top of page
HANGER IMPROVEMENTS
Overview
The ALLY Construction Services' team managed airport hanger floor and tarmac replacements in Trenton, NJ. A trowel-down Epoxy floor replacement specifically rated for aircraft weight was installed along with repavement of the surrounding tarmac. The toughest challenge this project posed was allowing a long enough window of time for work to be completed due to moving the aircrafts around for the hanger to be vacant.
Specs
Client: Leading Pharmaceutical Research Company
Size: Hanger 12,000 Sq Ft
Type: Airport Maintenance
Duration: 6 Weeks
1/5
bottom of page