FILLER LAB
Overview
A leading pharmaceutical company contracted with ALLY Construction Services for a lab upgrade to include installation of a custom, state-of-the art, 28,000 LB pill filling machine complete with lab gasses, HVAC, and a complex electrical controls system provided by the equipment manufacturer.
This lab was in a GMP suite and required a modification to air pressurization to ensure that zero dust/debris escaped the construction work area. The team successfully ensured that negative pressurization was maintained throughout the project.
Scope included quarantined lab space, change room pressurization, lab demolition/retrofit, installation of new service utilities, coordination of system shut down connections, sterilization of new compressed gas installation and equipment installation.
Specs
Client: Leading Pharmaceutical Research Company
Size: 750 Sq Ft
Type: Life Sciences
Duration: 5 Months