top of page

DAKIN HOUSE EV CHARGER INSTALL

Overview

Installation of one (1) Tesla car charging station and one (1) twin Universal car charging station (ability to charge three cars). Chargers were installed in a parking lot roughly 300 feet from the building. Installation required installation of underground conduit and an outdoor distribution panel. In addition to chargers, we installed protective bollards and guardrails and re-marked the parking areas for electric vehicle use only.

Specs

Client: Leading Pharmaceutical Research Company

Size: 1,000 Sq Ft

Type: EV Charging

Duration: 2 Weeks

bottom of page