PARKING GARAGE ELECTRICAL INFRASTRUCTURE

Overview

The existing parking garage electrical distribution system was in poor condition due to water infiltration and the age of the equipment. To avoid service disruption during the project, a new temporary service was installed while the old system was removed. The scope of work included the installation of a new electrical distribution system utilizing non-ferrous or hot-dipped galvanized materials, programmable garage lighting breakers, and a new 225-amp service dedicated to the EV Charging Panel, capable of supporting 16 new Level II chargers. Additionally, garage joint waterproofing was completed to prevent future moisture issues.

Specs

Client: Confidential

Size: 400-Car Parking Garage

Type: Electrical Infrastructure

Duration: 9 Months